Been in the trade for 22 years now and this is the first time I have done a whole install from start to finish. Didn't have my camera to take a picture of the clunker that was there, but suffice it to say it was a ***** to do. I also had to remove a 60 year old oil fired boiler and all the radiators. I also got a small fortune in copper from ripping out the tubing between the radiators. Now they have a brand new 3 ton Trane heat pump. Be kind. This is my time also doing ductwork. Here's a pic.
