Hey,
Im working on a Mcquay WMC just looking for some clarification. I have the EXV gain set at 175 and slope at 100. Can anyone tell me in english what the gain and slope refer to.
I want to speed up the unloading the chilled water leaving is at 45 and it doesn't start to unload untill 44.7 any sugestions.
I know that the EXV gain and slope have nothing to do with the unloading time Im just curious any info would be awesome.
Im working on a Mcquay WMC just looking for some clarification. I have the EXV gain set at 175 and slope at 100. Can anyone tell me in english what the gain and slope refer to.
I want to speed up the unloading the chilled water leaving is at 45 and it doesn't start to unload untill 44.7 any sugestions.
I know that the EXV gain and slope have nothing to do with the unloading time Im just curious any info would be awesome.